11.7.2011
Chapter 5.1 of Maynard's Handbook of Industrial Engineering, Work Measurement authored by Lawrence S. Aft is the base for this class. The chapter describes various systems of PMTS.
The objective of the class is to emphasize the popularirty of PMTS along with stop watch time study.
Came across the book Work measurement and methods improvement by Lawrence S. Aft, Wiley-IEEE, 2000 - 452 pages
http://books.google.com/books?id=B1DLXuts73cC
Work factor system History
Bio of A.B. Segur
A master thesis
AN ANALYSIS OF PREDETERMINED TIME SYSTEMS BY
RICHARD O. SCHMID
THESIS SUBMITTED TO THE FACULTY OF THE DEPARTMENT OF MANAGEMENT ENGINEERING
Of
NEWARK COLLEGE OF ENGINEERING For
MASTER OF SCIENCE WITH A MAJOR IN MANAGEMENT ENGINEERING Newark, New Jersey, 1957
http://archives.njit.edu/vol01/etd/1950s/1957/njit-etd1957-001/njit-etd1957-001.pdf
No comments:
Post a Comment